Bali Global Mission Hub
This project is a strategic pillar of the Bali Global Mission Hub master plan.
Special Donation Allocation Packages & Recognition Rights
Transparency & Good Governance Education: These strategic facilities, physical spaces, mission assets, or scholarships are dedicated for donors who wish to dedicate contributions in personal, family, alumni, foundation, or corporate names with accountable and officially recorded quotas.
BAIS Arena Prime Naming Rights
Naming of BAIS Arena's main facade, monumental inscription and honorary rights to all official publications.
VIP Stand Sector Sponsor
Sector naming of the main stand and honorary plaque at the sector entrance.
Sponsor 100 Arena Seats
The donor's name is engraved on the seat plaque and Arena Honor Book.
Three thousand seats. Not for an overnight show, but for meetings that change the course of thousands of people's lives — mission conferences, religious services, arts festivals, and events that bring together nations on the island of Bali.
Urgency & Reality on the Ground
Bali is host to hundreds of international conferences every year, but does not yet have a venue designed with a spirit of service. The Adventist Church in the Asia-Pacific region has had to rent hotels and function halls at great expense for each large meeting — costs that could have been diverted into scholarships and mission programs.
BAIS Arena addresses this need strategically. As the second mission engine in the Hub ecosystem, this arena has a dual function: it is a spiritual and community meeting place, as well as a source of income that supports the campus' financial sustainability. This is the core principle of the Bali Global Mission Hub — capital is given once, then the campus supports itself and multiplies that gift.
Real Actions & Implementation Plans
- 3,000 Seat Main Auditorium: Professional acoustics, stage lighting system and multi-level grandstand with optimal sight lines.
- Convention Center & Multi-Purpose Space: Supporting plenary space, parallel workshop space and exhibition area.
- Supporting Facilities: Reception lobby, artist dressing room, technical control room, cafeteria and adequate parking area.
- Security & Safety Systems: Standardized evacuation routes, fire extinguishers and integrated surveillance systems.
- Utilization Program: Calendar of mission conferences, music & arts festivals, as well as venue rentals to support operations.
Budget Transparency & Planning (PSAK 109)
Development funds are recorded as funds tied to social infrastructure programs and are absolutely separate from foundation operational funds. Proportional allocation:
- Arena Structure & Construction Post (58%): Foundations, wide-span structures, and building envelopes.
- Acoustics, Stage & Sound Post (16%): Audio-visual systems, stage lighting and room acoustics.
- Seat Posts & Interior (11%): Grandstands, spectator seats and interior finishing.
- MEP & Safety Post (9%): Mechanical, electrical, air conditioning and fire protection systems.
- Supervision & Contingency Post (6%): Supervisory and risk reserve consultant.
Each disbursement of funds goes through gradual term control with verification of physical milestones and minutes of field handover.
Channeling Love, Bringing Hope
"An arena built for His glory will echo far beyond its walls."
When three thousand voices unite in praise in Bali, the world will hear. Let's be part of that echo.
Construction of BAIS Arena (Auditorium & Convention Center 3,000 Seats)
Long-term physical infrastructure and facility project with a defined capital target (e.g., Campus, Dormitory, or Land Acquisition). Restricted funds are disbursed strictly in phased construction milestones backed by technical audits.
Share to Instagram
Copy caption & link sticker for Story / Feed
Tip: Open Stories, paste the caption text, then use the "Link" sticker to add the foundation's link.
Scan Official QR Code
Scan with your smartphone camera to read this article or share with family and friends.
Official Foundation Legality
Ministry of Law & Human Rights (Kemenkumham RI): AHU-0044516.AH.01.12.Tahun 2025 Tanggal 24 November 2025